Page 137 - Conference Book The 3rd IConVET "Future of TVET Graduates: Developing Talent for Industry 4.0 and The New Normal"
P. 137

The 3  International Conference
                                                        rd
                                       on Vocational Education and Technology (IConVET)
                                                              th
                                 Universitas Pendidikan Ganesha - Bali | 7  November, 2020
            BUSINESS PROCESS IMPROVEMENT DESIGN OF
              COMPLAINTS ON TECHNICAL INFORMATION
                SYSTEM PROBLEMS USING THE BUSINESS
            PROCESS IMPROVEMENT METHOD AT UPT. TIK
                                    UNDIKSHA

                             I M A Pradnyana , I M E Listartha 2
                                          1
          1,2  Program Studi Sistem Informasi, Universitas Pendidikan Ganesha, Jl. Udayana
                 No.11, Banjar Tegal, Singaraja, Kabupaten Buleleng, Bali 81116

                     1
               Email:  ardwi.pradnyana@undiksha.ac.id,  listartha@undiksha.ac.id
                                                  2
          Abstract. UPT. TIK Undiksha is one of the organizational units that have
          supported  business  processes  for Undiksha's main  business processes  to
          produce quality graduates. Various attempts were made to  optimize  the
          quality of ICT services. This study aims to provide recommendations for the
          improvement of one of the business processes at UPT. TIK Undiksha. The
          researcher proposes a business process design for complaints about technical
          information systems problems (To-Be) based on the results of the As-Is
          business process modeling  and evaluation of the problems. The analysis,
          evaluation, and recommendations for business process improvement in this
          study  use  the Business Process  Improvement  (BPI) method. The
          streamlining tools proposed to optimize as-is business processes  are
          standardization and upgrading. The simulation results show that there is a
          decrease in the use of resources and a decrease in time for the design business
          process compared to the current business process.










                                                        | IConVET 2020 | 137


                                       https://conference.undiksha.ac.id/iconvet/   | 137 |
   132   133   134   135   136   137   138   139   140